Shopping Cart

0

Your shopping bag is empty

Go to the shop

Check Cord Dog Leash Long Lead Training Tracking Line Comfortable Handle Heavy Duty Puppy Rope 10Ft 15Ft 30Ft 50Ft for Small Medium Large Dog

$23.18

SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether...

Special Offer

  • In Stock
  • Free delivery available*
  • Sale 30% Off Use Code: Deal30

sold in last Hour

Dresses Size Chart

Dress Size Chart (Inch)
DRESSES
SIZE IN INCHES
SIZE US / CAN BUST WAIST HIPS
XS 0 31"-32" 24"-25" 34"-35"
S 2-4 33"-34" 26"-27" 36"-37"
M 6-8 35"-36" 28"-29" 38"-39"
L 10-12 37"-39" 30"-32" 40"-42"
XL 14 40"-42" 33"-35" 43"-45"
Dress Size Chart (cm)
DRESSES
SIZE IN CM
SIZE US / CAN BUST WAIST HIPS
XS 0 78.7-81.2 60.9-63.5 86.3-88.9
S 2-4 83.8-86.3 66-68.5 91.4-93.9
M 6-8 88.9-91.4 71.1-73.6 96.5-99
L 10-12 93.9-99 76.2-81.2 101.6-106.6
XL 14 101.6-106.6 81.2-88.9 109.2-114.3

Swimwear Size Chart

Dress Size Chart (Inch)
SWIMWEAR
SIZE IN INCHES
SIZE US / CAN BUST WAIST HIPS
XS 0 31"-32" 24"-25" 33"-34"
S 2 33"-34" 26"-27" 35"-37"
M 4 35"-36" 28"-29" 37"-38"
L 6 37"-39" 30"-32" 39"-41"
XL 8 40"-42" 33"-35" 42"-44"

Shoes Size Chart

US EURO UK AUS JAPAN CHINA
5 35-36 3 3.5 21.5 35
5.5 36 3.5 4 22 35.5
6 36-37 4 4.5 22.5 36
6.5 37 4.5 5 23 36.5
7 37-38 5 5.5 23.5 37
7.5 38 5.5 6 24 37.5
8 38-39 6 6.5 24.5 38
8.5 39 6.5 7 25 38.5
9 39-40 7 7.5 25.5 39
9.5 40 7.5 8 26 39.5
10 40-41 8 8.5 26.5 40
11 41-42 9 9.5 27.5 41

Delivery

    All orders shipped with UPS Express.

    Always free shipping for orders over US $250.

    All orders are shipped with a UPS tracking number.

Returns

    Items returned within 14 days of their original shipment date in same as new condition will be eligible for a full refund or store credit.

    Refunds will be charged back to the original form of payment used for purchase.

    Customer is responsible for shipping charges when making returns and shipping/handling fees of original purchase is non-refundable.

    All sale items are final purchases.

Help

Give us a shout if you have any other questions and/or concerns.

Email:

Phone: +1 (23) 456 789

Ask a Question

Real time Visitor right now

  • SUITABLE THICKNESS CHECK CORD: To find a balance between weight and strength. 3/8” is a suitable thickness for long training dog leash, it has both strength and portability
  • NO TANGLE LONG ROPE LEASH: the round climbing rope and 360 degree rotating clasp design long training leash will not tangle whether it is in use or when you roll it up, great for hiking, camping, training, hunting, backyard, beach, recall training, outdoor play with tennis balls, and swimming
  • LIGHTWEIGHT AND NOT ABSORB WATER: soft and lightweight Non-absorbent material won't get more and more heavy in the water and won’t sink, it will float when submerged and highly visible against any background.
  • SOFT AND DURABLE DOUBLE LAYER WOVEN HANDLE: check cord has a comfortable woven double layer handle, the joint of the rope is sewn by the machine and is very strong.
  • SIZE: 3/8" (9.5 mm) in diam ,Size of this one is 30foot,color orange, by 10 foot 15 foot, 30 foot and 50 foot three length for different training purpose

Product Description

Lynxking Snap Hook Long Leash Dog Lead

A dog lead is used for no pull to ensure safety,for improving our experience walking with our pets. It can be used further for training purpose to train your dog recall,for off leash training and other obedience skills. Lynxking long leash is a perfect choice for training and exercise your dogs. Our long lead check cord is made with high-durability rope,gentle on hand,with a heavy duty swivel hook and a soft padded handle for ultimate comfort,very suitable for in-field or at home training as daily walking,camping,hiking,swimming,beach,backyard playing with tennis balls.

  • Our dog rope long lead comes in 5 vibrant colors to match with your collar or harness,high visible against any background.
  • 3/8 inch in diameter by 10ft 15ft 30ft 50ft long to meet various training purposes

10ft & 15ft: perfect for daily walking,hiking,ensure safety control

30ft: close ball play,using the pottywith freedom

50ft: recall training,off leash training,running with freedom

Soft Padded Handle

Double layer,soft padded handle to free your hand from rope burns

Heavy-duty Swivel Hook

A plated,360 degee rotatable hook to resist tangle in use

Non-absorbent material

Made with fine knitted,high-durability rope,ligtweight and non-absorbent,it will float when subermerged in the water.

Easy to Carry and Store

Equipped with a portable backpack for easy carry and store

Long Training Check Cord

Our dog leash is perfect as a tool for training your dogs. It has enough length to allow your dog wander freely while ensure your command to come obeyed.It will be a powerful aid to teach your dog recall,for off leash training.

No Pull Long Lead

Dogs tend to pull when excited,scared or meeting new furry friend. This long lead proved to be effective to restrain your dog from pulling foward,a no pull solution to ensure safety.

Long Leash for Walking

Walking with our pets is the most everyday activities,which can enhance our bonding experience with our pets. Our check cord is an essential equipment when walking with your dog.

Dog Rope for Exercise

As a further use,it's also a good choice to use this long lead when exercising with your dog. Now,enjoy the fun of running together with your lovely dog on our lead!

More Infomation To You

Things you need to know

We use industry standard SSL encryption to protect your details. Potentially sensitive information such as your name, address and card details are encoded so they can only be read on the secure server.

  • Safe Payments
  • Accept Credit Cart
  • Different Payment Method
  • Price Include VAT
  • Easy To Order

Express Delivery

  • Europe & USA within 2-4 days
  • Rest of the world within 3-7 days
  • Selected locations